Lefilter2025-05-19 BACK TO LIST
Country: Australia
Application: Municipal Water Treatment
Application Scenarios: Urban Drinking Water Pretreatment
Project Model: **City Water Treatment Station Capacity Expansion and Redundancy Upgrade
Project Description: Upgraded 6,000 m³/day from 3,000 m³/day to ensure continuous operation during backwashing or maintenance. Finally, reduce total organic carbon (TOC) from 5.0 mg/L to <1.0 mg/L and chlorine residuals to <0.05 mg/L.
99.9% uptime with dual-filter redundancy, 95% of backwash water recycled to headworks, Carbon media reactivation reduces waste by 60%.
Send Your Inquiry