MBR style UF membrane EPC project!

Lefilter2025-05-19 BACK TO LIST

Country: UAE

Application: Municipal Water

Application scenarios: Urban lake water circulation system

Project Model: ** UF workshops operator replacement project

Project Description:

As the operator of the UF workshop, it is necessary to cost-effectively replace the existing ultrafiltration membrane system to ensure a stable processing capacity of 2500 cubic meters per day and achieve seamless switching between the old and new systems.

Based on the effluent quality (e.g. high sulfate, low microorganisms), anti-fouling 0.03 micron PVDF membrane is recommended.

Compared to competitors, the products we supply have approx. 30% longer lifespan and the price is more favorable than the original ones.

image

Send Your Inquiry

whatsapp