Lefilter2025-05-19 BACK TO LIST
Country: UAE
Application: Municipal Water
Application scenarios: Urban lake water circulation system
Project Model: ** UF workshop’s operator replacement project
Project Description:
As the operator of the UF workshop, it is necessary to cost-effectively replace the existing ultrafiltration membrane system to ensure a stable processing capacity of 2500 cubic meters per day and achieve seamless switching between the old and new systems.
Based on the effluent quality (e.g. high sulfate, low microorganisms), anti-fouling 0.03 micron PVDF membrane is recommended.
Compared to competitors, the products we supply have approx. 30% longer lifespan and the price is more favorable than the original ones.
Send Your Inquiry